On the roadmap
Timetables
A constraint-aware timetable scheduler — building period grids, handling teacher and room clashes, and managing substitutions — is planned but not built yet.
Today, the building blocks already exist: periods are defined per school inside Master Configuration, alongside academic years, classes, sections and subjects. The visual scheduler is the next step on top of that foundation.
Talk to us about your timetable needs